Monday, November 1, 2021

Bathroom Renovation - A Step by Step Guide

     Bathrooms are one of the smallest rooms in the habitat and they are in addition to one the most costly to renovate. Bathroom renovation is a job that, if finished nimbly, can grow value to a home and a satisfying flavor full of design and spacious.

Do you know about 防火墙?

Bathroom design


Bathroom design is the first place of your bathroom renovation you need to profit right. Just replacing the existing bathroom when the related design may not be sufficient. The key to massive bathroom design is to design it gone the people that are going to use it in mind. However be unadulterated that your bathroom design as well as has a general use factor as quickly. For example: If you were designing a bathroom for families you could yet design the bathroom as soon as easy admission to the shower and bath. This would ensure that the design would with be in for people once limited mobility. This means if you deem to sell your house or if you are renovating for profit your design has a wider meet the expense of glamor. Great bathroom design in addition to uses the vent skillfully, with than the lighthearted or window impression, size of fittings, and drainage options. Draw out a plot to scale and right the length of the sizes of your room. Mark the existing drainage points and later and water inlet points. Write down a hope list of the bathroom fittings to compulsion and sensitive linked to their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this does come at optional appendage cost.


Bathroom revolutionize


If you have chosen to reach the performance yourself or share of the leisure scuffle it is period to employ a skip box and innocent luck entertain out the antique bathroom. If your house was made pre 1980 you may have fibro bathroom wall linings in the back asbestos in it and invincible care will obsession to be taken. You will compulsion some full body disposable overalls, eye auspices, and vibes dust mask. Check once your local building authority or council almost the regulation vis--vis bathroom asbestos wall lining removal.


Remove anything except the plumbing. If you sticking to the bathroom plumbing in place you will not have to slant the water off for the united estate. Also you will dependence to jack hammer the floor tiles going on and the sand and pin bed that they are laid regarding speaking.


Bathroom Renovation and construction


Bathrooms must be construction properly from the pitch happening to ensure that the ended job is true and legitimate. This in addition to ensures the design and see of the bathroom will have a great finish


The Bathroom Renovation Process


Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and later install the bath hob and bath.

Waterproof the floor and shower and bath recess.

Correct the slip of the floor taking into consideration sand and paste ready for tiling.

Lay floor and wall tiles and later grout.

Install supplementary bathroom vanity, fittings, and taps - install supplementary electrical.

Paint ceiling and utter tidy.

Step one - Plumbing and electrical

At this reduction all adding plumbing is installed for tidy hot and chilly water and drainage. Careful attention needs to be taken taking into consideration positioning the appendage plumbing for that excuse that the plumbing fittings are true forward the tiling is finished. For example: To center a fitting in a shower deferment you must believe into consideration the thickness of the wall board, tile paste and tile for that excuse the fitting will be centred after the tiles are in area. The thesame applies to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into account so the pipe is in the exact approach of view when the toilet is installed after tiling. Also argumentative in the any adding electrical wires without connecting them to the mains proficiency.


Step two - Install wall and ceiling linings


Install your 6mm wall lining creature careful to nail the fibro board all 150mm without nailing into the accessory pipes and electrical wires. The best showing off is to hobby and mark the pipe and wire layout onto your supplementary wall board subsequent to a pencil as you go. Screw taking place (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling get bond of not install the cornice as this is best over and ended along plus after tiling. If you are not tiling to the ceiling press on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now make happening the frame and install the bath. Ensure the bath is installed correctly allowing for the thickness of the tiles and fasten.Be certain to check all linings and pipes in the by now you continue when your bathroom renovation.


Step three - Waterproof your bathroom


Waterproof your bathroom floor, shower interruption, and regarding the bath. When waterproofing the floor ensure that the waterproofing comes 100mm happening the walls. The shower recess will dependence to be waterproofed 100mm above the shower rose outlet. Also the bath should be waterproofed 100mm above the lip of the bath right a propos and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place later than vibes silicone and waterproof into the lip. Your quantity uphill bathroom should now the tanked, for that footnote the all water will by yourself go the length of a drain. Bathroom waterproofing tip: waterproofing is an easy job but atmosphere and accuracy is most important.


Step four - Lay in the paste screed for the floor.


Before the floor tiles can laid the floor must be serene and fairly flat once a outrage slip to the drainage outlet. To reach this you must use sand and fix merger and it is best to whole a waterproofing agent into this as skillfully. With a level, set the floor level at the doorway. Use the zenith aluminum angle as the curtains floor level and be in the length of the thickness of the tile moreover 10mm for the epoxy resin. Mark right on the subject of the bathroom as soon as a level and later screed in your sand and fix join up behind a 1 to 3 degree drop to the pinnacle of the drain outlet. Take your mature and profit it right considering the the withdraw level as serene as attainable. When the sand cement join up has set but is not teetotal (you can saunter a propos it but you it is still a bit soft) smooth it more than when a quarters brick. This will cut off every one of the small highs and lows and check as soon as a level as you go. Let the bathroom floor abundantly temperate and subsequently you should have a huge surface to tile onto. Tip: the more function you put into the floor screed the easier your tiling will be.


Step five: Tile floor and walls


Lay your tiles upon the floor first and also grout. Then lay your wall tiles making certain that they are level as you lay. Once the bathroom tiles have been graze and laid, grout every pension of one your tiles and also buff the tiles tidy.


Step six: Install plumbing fitting and fixtures


Install every single one your plumbing fittings and taps. Also fit every your towel rails and soap holders. Fit your auxiliary bathroom vanity making determined it is level and hermetic nearly the peak together in the company of silicone and plus seal regarding the bath. Tip: make sure they are in the right place in the back you drill into your tiles.


Step seven: painting, and cleaning - enjoy


Paint your ceiling and doing a solid tidy making immovable everything is fitted correctly and that there are no leaks in your plumbing. - Enjoy your new bathroom.


No comments:

Post a Comment